The engineering contractor NG Bailey’s IT Services division has completed a £1.2m project to deliver ICT at Birmingham City University’s Institute of Art & Design (BIAD).

The project represents the first ICT phase in a £250m redevelopment at the university and was awarded to NG Bailey by main contractor Willmott Dixon.

The contractor has delivered an IT fit out to the art and design facility, including a Cisco fibre network backbone throughout the building that also connects the Institute to the university’s legacy mainframe infrastructure. The building’s core operating systems including security, access control and fire alarms, with its building management system, have all been migrated to a centrally monitored and managed all-IP network.

David Stanley, Assistant Project Director at Birmingham City University said: “The building is fully commissioned and we are reaping the full benefits of NG Bailey’s robust and resilient IT installation. The university now boasts some of the best art, design and media facilities in the country, which gives us a huge draw; we are attracting the highest calibre candidates from around the UK and indeed internationally.”

NG Bailey was tasked to upgrade the university’s primary data centre, to address future demand. This included the redesign and installation of new cabinets to reduce the data centre’s footprint and enable expansion. New technologies to drive green efficiencies have also been introduced, including Hot Aisle Containment, power distribution units and temperature sensors that enable each cabinet to be monitored. These were all done to increase capacity, reduce the university’s energy consumption and increase its cooling efficiency by more than 30pc.

Indi Sall, Technical Director, for NG Bailey’s IT Services division is pictured after speaking recently on building systems at the last 2014 business group meeting of the Association of Security Consultants (ASC). He added: “Our team was uniquely positioned to deliver an infrastructure that has transformed the way the university can provide its ICT solution to staff and students. The combination of NG Bailey’s broader knowledge of building, electrical and mechanical engineering with its specialist expertise in ICT systems gives our installation team a keen awareness of the wider building context, enabling us to anticipate and resolve installation challenges before they cause scheduling delays. Many of the building’s systems were pre-assembled and configured offsite, for example, in order to accommodate additional time needed to stabilise each room’s conditions, including humidity, lighting, heating and power delivery, all of which are needed before ICT installation can begin.

“This flexible and collaborative approach enabled us to progress despite fluctuations across multiple building delivery schedules and helped to ensure the project was delivered on time and on budget.”

Related News

  • Case Studies

    River Island audit

    by Mark Rowe

    A recent audit at River Island’s distribution centre in Milton Keynes has seen the fashion retailer achieve an “excellent” rating. The ‘Workplace…

  • Case Studies

    Tank weekend

    by Mark Rowe

    The Tank Museum at Bovington, Dorset, has announced Topher Ltd. as its provider of security and traffic management services for its annual…