Case Studies

Bifold gates for water firm

by Mark Rowe

The perimeter fencing company Zaun reports that it has installed trackless bi-folding automatic speed gates at a Thames Water administration building.

The vehicle gates – which incorporate live-monitored safety edges, dual height safety photocells and manual-disengaging vertical infill bars – have replaced old rising arm barriers at Kemble Court, pictured, Thames Water’s operations management centre in Reading.

The fencing firm also installed an adjacent pedestrian turnstile with a passage for bicycles and integrated the installation into existing fencing with 1.8m high HiSec fencing. The utility has specified it for one of their many sewage treatment plants, at East Hyde in Luton, that operates a combined heat and power (CHP) unit to generate the electricity the plant needs.

The CHP process ‘brews and chews’ sewage sludge to break down biodegradable material creating biomethane, or biogas, while methane from the sludge is burned to create heat, which in turn generates renewable electricity using a pre-treatment process called thermal hydrolysis.

Related News

  • Case Studies

    NCSC CEO speaks

    by Mark Rowe

    Lindy Cameron’s first speech as CEO of the UK official National Cyber Security Centre (NCSC) – delivered to a virtual audience at…

  • Case Studies

    London move

    by Mark Rowe

    After over 15 years in Russell Square House, The Risk Advisory Group’s London office has moved to new premises: 3 More London…

Newsletter

Subscribe to our weekly newsletter to stay on top of security news and events.

© 2024 Professional Security Magazine. All rights reserved.

Website by MSEC Marketing